Radio tv vojvodina program


















In the basement of this unit there is a large radio and drama studio. It is located in the production and technological part five TV studios from after , , and two per square meters with appropriate video and audio directing and accompanying spaces. There is also a music studio and two universal sound studios, studios and directors for broadcasting radio programs, as well as directors for broadcasting TV programs with the main technical control.

It is also located within the production and technological part central desk for the production of news programs including web, montages, of studios and spaces for editors and meetings separated by glass partitions. It is also planned to broadcast shorter shows or contributions from the desk itself workspace as a scenography. Spaces for storage of technological, energy and air conditioning equipment, archives and warehouses are also part of the production and technological part.

The interior is designed so that the emphasis is placed on functionality but also on the technical needs of the television. Thus, for example, the concrete walls in the production part are lined with stone wool on a steel substructure with rubber spacers on which gypsum boards and sound absorbers are then hung.

Thus, they are much needed acoustic properties which are necessary for quality broadcasting. In the new home of the Radio-Television of Vojvodina, the quality of the installed materials was taken into account, so in most of the space the space was placed on the floors. The business program part of the building consists offices and universal office spaces for editors and journalists of different sizes according to the needs of individual newsrooms.

There is also multimedia hall for ceremonies, promotions, presentations, lectures and trainings. Within the business program part of the building there is also restaurant with distributive kitchen and cafeteria which is solved with a dark wooden upholstery and chairs in different colors that play space.

Spatial markings and visual communication were done by the studio 3 oranges design from Novi Sad. The 17,square-foot RTV building is located at Micheluk — a location according to which the city of Novi Sad is just beginning to open.

The Novi Sad kovid hospital is currently being built near this building, as well as numerous residential buildings that you can see on the construction site map. Source: Gradnja by www. If there is any problem regarding the content, copyright, please leave a report below the article.

The works on the construction of the new building of Vojvodina's public service began in August with the demolition and removal of 26, cubic meters of the ruins of the old building, which had been demolished during the NATO bombing of As said, the construction was completed four and a half months before the expiration of the deadline.

The preparation of the project and the realization of the three phases of the construction, as well as the expert supervision, entailed the most demanding construction, hydro-engineering, electrical engineering, TC, mechanical and installation works, as well as the completion of the roads around the facility.

The procurement of the equipment worth RSD million, which is also financed by the Provincial Government and the Ministry of Culture and Information, is in progress, whereas the funds for the landscaping and the equipping of the facility with the necessary utilities were provided by the City of Novi Sad.

The new RTV building, where 1, employees will work, takes up a gross area of 17, m2. It will broadcast program in Serbian and 15 national minority languages, it is said on the website of the Provincial Government.

Only logged-in users can comment. Follow the news, tenders, grants, legal regulations and reports on our portal. Register for our daily business bulletin, which is sent to your email address at the end of each work day.



0コメント

  • 1000 / 1000